Objective H: Restore and protect key habitats and species diversity in the Peconic Estuary and its watershed

Meetings with all relevant partners to disseminate and discuss Critical Lands Protection Strategy

Coastal Watershed Grant: Groundwater refugia

2023 Successful Application for Coastal Watershed Grant

QAPP approved: July 2023

2023 Airborne thermal infrared survey: in documenting regions along open bay shorelines and semi-enclosed embayments where the cooling influence of groundwater discharge could be documented. Field teams completed radon surveys and subtidal sampling to guide eelgrass planting siting.

Eelgrass pilot sites chosen

Outreach Coordination with local SWMS Chapter

Increase in eelgrass shoot density and extent in existing beds

Overall net increase in extent of Peconic eelgrass beds

Restore 250 acres of tidal wetland habitat

Net increase in native high marsh habitat and total native marsh habitat from 2005 level

Net decrease in acres of invasive Phragmites from 2005 level

No net increase in hardened shorelines (includes breakwaters, bulkheads/seawalls, groins, jetties, piers, and revetments) from next measurement

Restore 242 acres of diadromous fish habitat on the Peconic River

Restore an additional 60 acres of diadromous fish habitat within other areas of the Peconic watershed

Increase in the alewife population in the Peconic River from current level

Land Protection Targets Acres of protected land (specific target to be determined based on updated CLPS and partner input)

Assistance provided to municipalities in land use planning and conversion of high-priority developed areas back to a natural state

CLPS 2020

CLPS 2025

CLPS 2030

Assistance to PEP partners in identifying and applying for land protection grants

Woodhull Dam/ Byron Young Little River Fish Pass

Forge Road Peconic River Fish Pass

Upper Mill Peconic Fish Pass - Engineering Design and Permitting

Upper Mill Peconic Fish Pass - Land Use Agreement

Funding secure

Upper Mill Peconic Fish Pass - Construction

Survey Site at Grangebel Park (TAC)

Survey Site at Woodhull Dam Fish Pass

Peconic-wide collation of data and results

River Herring and Eel survey (TAC)

Town of Southampton culvert replacement

Alewife Creek-Noyack Rd - Engineering Design and Permitting

Funding secure

Culvert replacemnet and storm drainage discussions

Alewife Creek-North Sea Rd - Engineering Design and Permitting

Funding secure

Permitting

Engineering Design

Funding secure

Construction

TNC Culvert Prioritization Project (TAC)

Identification of high priority culverts in Peconic Estuary watershed

Grangebel Nature Like Fish Passage (TAC)

Edwards Ave Fish Passage (TAC)

Byron Young Fish Passage (TAC)

Forge Rd Fish Passage (TAC)

Upper Mills Fish Passage (TAC)

Connecticut Ave Fish Passage (TAC)

Bio-Optical Model for SAV Restoration Site Suitability

Groundwaer Refugia Mapping for SAV Restoration

Pilot Restoration based on Model and Mapping

Coecles Harbor Eelgrass Revegetation (Program Office/TAC)

Bio-optical model (TAC)

Potential Temperature Refugia mapping (Program Office/TAC)

Napeague Harbor Hydrodynamic and Water Circulation Study (Program Office/TAC)

PEP 2014 Eelgrass Aerial Survey QAPP (Program Office/TAC)

2014 Peconic Estuary Aerial Eelgrass Survey (Program Office/TAC)

Peconic Estuary Eelgrass (Zostera marina) Aerial Survey Ground-Truthing Report (Program Office/TAC)

PEP 2024 Eelgrass Aerial Survey QAPP (Program Office/TAC)

2008 Long-Term Eelgrass Monitoring Report (Program Office/TAC)

2010 Long-Term Eelgrass Monitoring Report (Program Office/TAC)

2011 Long-Term Eelgrass Monitoring Report (Program Office/TAC)

2013 Long-Term Eelgrass Monitoring Report (Program Office/TAC)

2014 Long-Term Eelgrass Monitoring Report (Program Office/TAC)

2015 Long-Term Eelgrass Monitoring Report (Program Office/TAC)

2016 Long-Term Eelgrass Monitoring Report (Program Office/TAC)

2017 Long-Term Eelgrass Monitoring Report (Program Office/TAC)

2018 Long-Term Eelgrass Monitoring Report (Program Office/TAC)

2019 Long-Term Eelgrass Monitoring Report (Program Office/TAC)

2021 Long-Term Eelgrass Monitoring Report (Program Office/TAC)

2022 Long-Term Eelgrass Monitoring Report (Program Office/TAC)

2025 Peconic Estuary Aerial Eelgrass Survey (Program Office/TAC)

2025 Peconic Estuary Aerial Eelgrass Report (Program Office/TAC)

Annual SeagrassNET Monitoring in the Peconic Estuary (Program Office/TAC)

Annual Citizen Science Seagrass Monitoring (Program Office/TAC/LGC/CAC)

Conservation moorings

Regional Seagrass task force to determine managent acitons

Seagrass Workgroup

Annual EPA funding

Complete construction of priority wetland restoration project at Indian Island (Program Office)

Design Funds secured

Design complete

Permits obtained

Wetland restoration construction

Funding secure

Design plans

Funding secure

Contractor secure

Old Main Rd Culvert Engineering Design

Old Main Rd Culvert Permit Review

Funding secure

Contractor secure

Designs complete

Acquire Funding

Construction Complete

Shelter Island Wetland Assessment & Concept Plan (Program Office)

Project 2

Project 3

Project 4

Project 5

Participate in stakeholder group to coordiante Narrow River Plans & Construction

Narrow River Construction (Program Office/TAC)

Program Office (Program Office/TAC)

Finalize Paul Stoutenburg Wetland Restoration Engineering Plans

Obtain Paul Stoutenburg Wetland Restoration Plan Permits

Secure funding for implementaiton of Paul Stoutenburg Wetland Restoration

Complete Paul Stoutenburg Wetland Restoration

Meetinghouse Creek Construction (Program Office/TAC)

Completion of design and implementation of at least three priority projects identified through the Short-term Performance Measures under Action 31 (Program Office/TAC)

Meetings of PEP staff and municipalities to develop draft model policies (Program Office/Shorelien Adadptation Inititative)

Suffolk County Marine Environmental Learning Center Living Shoreline Project (Program Office)

Additional Monitoring

Widow's Hole Preserve Living Shoreline Project

Identification of additional sites to carry out living shoreline projects

PEP Shoreline Adaptation Initiative partnerships (Program Office/Shorelien Adadptation Inititative)

Funding Secure

NYSG partner needs assessment within peconic estuary (PEP Shoreline Adaptation Initiative)

River Otter Survey 2023-2024

Educational Sign about River Oter in the Peconics

PEP Fellow research on priority Horseshoe Crab habitat

Squires Pond Horseshow Crab monitoring site (Program Office)

Predicting spawning horseshoe crab habitat use in relation to natural and hardened shorelines (TAC)

Horseshoe crabs and diamondback terrapins satellite telemetry  in the Peconic Estuary

Funding Secure

Peconic Estuary Program 2015 Ecosystem Status Report (Program Office)

Peconic Estuary Partnership 2023 State of the Estuary Report (Program Office)

Peconic Otter Surveys (Program Office)

Funding Secure

Quality Assurance Project Plan for the Otter Survey

Horseshoe Crab strategy facilitation (Program Office)

Horseshoe Strategy Funding Secure

Horseshoe Strategy Funding

Diamondback Terrapin Isotope/Telemetry Study (Program Office/TAC)

Funding secure

New York Peconic Estuary Atlantic Coast Joint Venture (ACJV) Saltmarsh Sparrow Restoration (Program Office)

Member of Suffolk County 10 year Aquaculture Lease Board

Peconic Bay Scallop Annual Survey

Initiation of the Peconic Bay Scallop Technical Committee

Initiation of the Peconic Bay Shellfish Restoration Workgroup

Clam Monitoring Assessment in the Town of East Hampton

Designation of shellfish spawning sanctuaries